FCS Old Gym
Work Package #4
-
Renovation of the FCS Old Gym will require extensive architectural and engineering work. It is currently represented as Work Package #4 with an anticipated timeline of Summer 2027.
-
• Band and Choir Room
• Locker Rooms
• Gym Floor
• Roof repair
• Lighting
• Paint