FCS Old Gym

Work Package #4

  • Renovation of the FCS Old Gym will require extensive architectural and engineering work. It is currently represented as Work Package #4 with an anticipated timeline of Summer 2027.

  • • Band and Choir Room

    • Locker Rooms

    • Gym Floor

    • Roof repair

    • Lighting

    • Paint

Return to Bond Updates